CRUSHING OF
CONSTRUCTION DEBRIS

Turn waste into value by getting reusable material!

A great alternative for construction waste disposal!

Processing in accordance with legislative requirements!

Lower costs than construction waste disposal!

From waste to value

Construction and demolition waste includes a large amount of construction materials that can be reused through recycling.

In order to cope with both the growing stock of waste and the ever-increasing need for raw materials, new environmental regulations are being introduced that encourage the use of recycled materials instead of natural resources.

With a customized crushing equipment, more than 95% of construction waste can be reused as raw materials for various building materials.

It has great economic value and social environmental value!

 

GALLERY

Recover materials for new products

After the building is demolished, it is best to sort the construction waste on site at the facility. Thus, the amount of waste and the cost of the waste management service is reduced. The higher the proportion of reused materials, the greater the savings in waste management costs!

In addition, if the construction of a new building is planned immediately, the cost of purchasing new building materials is reduced. This allows valuable materials to be re-circulated after the building is demolished, instead of going to the landfill!

GALLERY

Recycling of construction waste

Construction debris is crushed with a mobile crushing device GIPO R100K, (in fraction 0/63 mm), obtaining crushed construction debris fragments that can be purchased by any person. Construction debris chips are suitable for various construction works, such as road base preparation, construction of temporary roads, construction of pedestrian sidewalks, roads with light daily load and others.

Recycling construction and demolition waste is a cost-effective and environmentally friendly way to produce mineral materials and reuse valuable materials that would otherwise be disposed of!

CONSTRUCTION DEBRIS CHIPS

BENEFITS

The construction waste recycling process provides for the longest possible lifespan of the used materials, reducing the amount of waste and the consumption of new natural resources!

CONTACT US!

Fill out the application form and we will contact you!

Office address Aviācijas street 4A, Jelgava
Work Hours:

Working days: 08:00 – 17:00

Weekend: CLOSED

    REQUIRED FILES (Optional)

    Office address Aviācijas street 4A, Jelgava
    Work Hours:

    Working days: 08:00 – 17:00

    Weekend: CLOSED