Project development

The project is one of the first steps towards the realization of the idea!

DEVELOPMENT OF DOCUMENTATION FOR DEMOLITION OF BUILDINGS AND STRUCTURES

We offer development of complex building demolition documentation – from conception to commissioning!

We provide administration of construction case processes in the Construction Information System (BIS).

The construction work log is considered the first execution document, which reflects the progress of the work at the object from the beginning to commissioning (work organization, conditions, deadlines, quality of construction works, etc.).

The construction logbook is signed on behalf of the hired legal entity or approved in the construction information system by the relevant construction specialist.

WHAT DOCUMENTS ARE NECESSARY TO COORDINATE THE DEMOLITION OF THE BUILDING?
Explanatory articleConstruction project with minimum composition

For demolition of Group I buildings in all cases, even if the building is connected to engineering networks;

Group II one-story buildings, which in many cases are private houses, provided that this building is not connected to external engineering networks (or they are disconnected) – water supply and sewerage, power lines, etc. c. – and the construction board has received an opinion on this from the owners of communications.

Structures of groups II and III, which are not disconnected from engineering networks

Develops and manages

RESPONSIBLE CONSTRUCTION MANAGER

Develops and manages

DEVELOPER OF THE CONSTRUCTION PROJECT

The explanatory text includes:

  • Explanatory description
  • Situation plan
  • Land boundary plan
  • Photofixation of buildings older than 40 years

Construction project with minimum composition:

  • Explanatory description
  • Topographic plan (prepared by the Customer)
  • Technical regulations (if the building is not disconnected from utility networks)
  • (DOP) Work organization project
  • (DVP) Work execution project

Construction process

⇓ INTENTION

  • Construction design
  • A mark on the acceptance of the construction plan

⇓ CONSTRUCTION WORKS

  • A mark on the fulfillment of the conditions for starting construction works
  • Construction works

⇓ COMPLETION OF CONSTRUCTION

  • A mark on the completion of construction works
  • Information about the absence of the building in nature

⇓ INTENTION

  • Construction design
  • Construction design application + documents

⇓ ISSUANCE OF BUILDING PERMIT

  • Design conditions
  • Conditions for starting construction works

⇓ DESIGN

  • Designing
  • A mark on the fulfillment of the design conditions

⇓ CONSTRUCTION WORKS

  • A mark on the fulfillment of the conditions for starting construction works
  • Construction works

⇓ COMMISSIONING

  • Act on acceptance of the building into operation or
  • Certificate of readiness of the building for operation

How are buildings classified?

  1. group structures. The simplest buildings – for example, individual industrially made one-story buildings with a built-up area of ​​up to 60m2; single-storey buildings, including sheds and auxiliary buildings, the construction area of ​​which is not larger than 25m2
  2. group structures. Buildings of medium complexity – for example, detached houses, multi-apartment buildings up to five floors, public buildings, production buildings with a total area of ​​up to 1000m2
  3. group structures. Buildings of increased complexity – buildings in which more than 100 people can stay at the same time, large production and warehouse buildings, large infrastructure objects

CONTACT US!

Fill out the application form and we will contact you!

Office address Aviācijas street 4A, Jelgava
Work Hours:

Working days: 08:00 – 17:00

Weekend: CLOSED

    REQUIRED FILES (Optional)

    Office address Aviācijas street 4A, Jelgava
    Work Hours:

    Working days: 08:00 – 17:00

    Weekend: CLOSED